The ISO document is a draft
A DIS cannot be cited as the applicable standard and cannot be certified against. If a contract or questionnaire cites ISO 27003 today, the citation needs a version and a status. What the record shows.
ISO/IEC DIS 27003 is Edition 3 of the guidance for applying ISO/IEC 27001:2022. It is at stage 40.00, DIS registered, and it is not published. The requirement you are audited against is already 27001:2022. This site separates the two, clause by clause and control by control, so you can prepare on the requirement and use the draft as guidance.
Read from the real rules, not invented. Every line points to the ISO/IEC 27001:2022 clause or the ISO/IEC 27002:2022 control behind it, so you can check any answer yourself.
No account for the free check. Not legal advice; does not certify. Published by Gerard Blokdyk, The Art of Service. The official ISO record.
Most teams can describe their ISMS and cannot produce the record an auditor asks for. The register turns each clause into the evidence an assessor will request, so the answer is ready before the question.
Photo: fauxels on Pexels, free licence.
A DIS cannot be cited as the applicable standard and cannot be certified against. If a contract or questionnaire cites ISO 27003 today, the citation needs a version and a status. What the record shows.
The certifiable requirement is ISO/IEC 27001:2022. The draft explains how to apply it. That means the clause work can start now, and the guidance can be adopted when it is published. The clause register.
ISO records no publication date. The planning date used here is 13 September 2027, derived from the current stage and the normal ISO path and labelled a projection. ISO has not committed to it. The dated timeline.
The check reads your certificate edition, your Statement of Applicability, your next audit window and the guide you use today. It returns a verdict, three actions and three clauses to read. It runs in the browser and sends nothing.
It never treats a missing answer as the lighter pathway. If an answer is missing, it says so and names the fact it needs.
The requirement moved. The guide did not. The gap is in clause 6.3, the 93-control Statement of Applicability and the 2022 clause language, not in the draft.
Every reading is computed from the answers, not typed by hand.
Context, leadership, planning, support, operation, performance and improvement. Each page states the requirement, the guidance lens, the evidence and the auditor's question. Open the register.
Organizational, people, physical and technological controls. Each page states the control, its purpose, the evidence line and the common gap. Open the controls.
The paid kit turns the free register into a working file: PDF, CSV and XLSX, plus a dated plan. The specimen is labelled and free. See the specimen.
Confirm the certificate edition. Rebuild the Statement of Applicability against all 93 controls. Trace every treatment action to an owner.
Read the draft as guidance, not requirement. Mark where the 2017 guide is behind 27001:2022: 6.3, the Annex A restructure and the climate amendment.
The stage will move. The watch emails when the stage, the guidance or the dates change, with the diff and the clause affected.
No. ISO records ISO/IEC DIS 27003 at stage 40.00, DIS registered on 2 October 2026. A DIS is a draft in the enquiry phase. It cannot be cited as the applicable standard and no certificate is issued against it. The planning date of 13 September 2027 is a projection, not an ISO date.
No. ISO/IEC 27001:2022 is the certifiable requirement standard. ISO/IEC 27003 is guidance on how to apply it. No certificate depends on 27003, and no transition audit is triggered by it. The draft can change how you evidence the requirement, not what the requirement is.
One page for each of the 30 ISO/IEC 27001:2022 clause requirements and each of the 93 Annex A controls. Every page states the requirement in plain words, the guidance lens, the evidence an assessor asks for, the common gaps and the source.
The full 123 unit register, 671 evidence lines and a dated plan in PDF, CSV and XLSX, with an owner and a due date column on every line. A labelled specimen shows the shape before you buy. The change watch is USD 49 a month.
Yes, as guidance. Use it to improve how you apply the 27001:2022 requirement. Do not cite it as a requirement, do not claim certification against it and do not rewrite controlled documents in draft language before publication.
No. It is a reference and a working register. It does not certify, audit or give legal advice, and it is not affiliated with or endorsed by ISO or IEC.